ATCC Biomanufacturing Facility

Owner: ATCC
Architect: Ewing Cole
Location: Manassas, VA

The ATCC Biomanufacturing Facility is a new two-story biomanufacturing facility under construction on ATCC’s Manassas campus. It replaces a single-story containment building and parking lot adjacent to the main building and repository. The new facility will house BSL2 and BSL3 laboratory spaces, administrative offices, support areas, shipping and receiving facilities, and warehouse space.

A steel frame supports an interstitial mechanical level dedicated to HVAC systems and utility distribution, allowing for efficient operations and future adaptability. Construction also includes site modifications to existing campus parking and infrastructure to integrate the facility seamlessly.

This high-security, high-complexity project is being delivered in close collaboration with ATCC and the design team, with a focus on precision, safety, and regulatory compliance.